We are off to Knoxville early tomorrow and will be gone around 10 days. I have managed to pack a few travel projects. I had hoped to take the Vancouver sweater as well but it doesn't look like that one is going along. It is getting late. I don't have that together and we are leaving early tomorrow. I probably have too much knitting as it is.
Generally, the projects I am taking are simple. With a 900 mile drive each way I would normally get lots of knitting done. DH has always felt it is his duty to drive and mine to sit and knit and I can't say that I have objected all that much, although I generally do enjoy driving. Last trip I drove almost half the trip, probably for the first time in our 21 years of marriage. This time he has already told me that he doesn't feel up to driving much, so it looks like I will be driving more.
But I had already pulled out the yarn and packed it up. So I may or may not be knitting. Either way, I won't be blogging as I am not taking the computer this trip. I haven't gotten as far along as I would have hoped with taking pictures and getting things together on Ravelry either, so I have little to show you.
My first project is a ribbed shrug using this yarn:
It is a quick project on size US 10 needles and I am already about 1/3 of the way through it.